Final assembly, as well as production and installation of key components, is done in house for
all weapon systems. Modern workshops which are suitable for handling large size live weapons
and are equipped with state of the art tools and test benches, are used by regularly trained SEI
personnel. Outsourced components are made in accordance with SEI specifications and
undergo strict incoming inspection and testing before entering the production line.
Accuracy of in-process and final testing, ensure that each system meets both quality and
operational requirements.


Murena Target Detection Device assembly.



Murena final assembly.
Murena Target Detection Device final inspection.


CAP charge electronic board assembly and testing.
Manta case assembly.

• Production: aircraft bombs

• Explosive filling

• Laboratories & Quality Policy

• Research & Development

All pictures and text of this page are property of SEI. Reproduction in total or in part is stricly forbidden by law